EKE-Engineering LLC
(EKE Group)
Residential compound «Two Eras» with built-in commercial premises and an underground car park at St. Petersburg, 18 line VO 49 4 lit.
Enabling works. Concrete blinding coat. Installation of base slabs. Installation of solid structures. More than 7,700 m3 of concrete placed.
NCC Real Estate LLC (NCC company)
Residential compound «Grona Lund» at the address: Leningrad region, Vsevolozhsk district, Shcheglovo JSC.
Erection of prefabricated reinforced concrete frame buildings of two apartment houses. Installation of the panels.
SRV Development LLC (SRV Development), SC «Okhta Mall»
St. Petersburg, st. Magnitogorskaya 11, lit. H.
In-situ concreting: foundations, foundation slabs, beams, floor slabs, columns, walls. Elevator shafts, including the upper and lower slabs. Round columns.The base slab for the fire tank, the walls and the roof. Stairwells (with the bottom and top slabs). More than 10,000 m3 of concrete placed. Installed more than 30,500 m2 of industrial concrete floors with different types of coatings.
Compact CJSC
«Building a plant for the production of Siemens gas turbine parts»
Leningrad region, Lomonosov district, Officers village, quarter 2.

Arrangement of concrete blinding.
Reinforced concrete slab of 450 mm thickness with top layer of the area of over 9,300 m2.
Foundations and the pit, more than 460 m3 of concrete.
LEROM Furniture Company LLC, Workshop for the production of molded products with repair shops at Penza region, ZarechnyPerformance of fiber-concrete industrial floors with reinforced top layer of the area of over 77,000 m2.
Sterkh Corporation
Warehouse complex, I, II, III stages of construction, dry warehouse at Saint Petersburg, Pargolovo village, Prigorodny, section 39.
General contractor: BIK-General Contractor LLC.

Construction of concrete blinding coat.
More than 83,000 m2 of concrete slabs of industrial concrete floors with strengthened top layer installed.

The first phase of Almaz-Antey SZRTS №1 Concern PVO housing
at the address: St. Petersburg, av. Obukhov Defense 120.
General Contractor: Compact CJSC.
Foundations for equipment.
Solid concrete slab floor on the area of over 67,000 m2.
Installation of cast reinforced concrete floor slabs.

Central Olympic stadium with a capacity of 40 thousand spectators (1st, 2nd and 3rd phases of construction)
address: Sochi, Imereti lowland, Krasnodar region.
Customer: Olimpstroy Corporation
Contractor: ENGEOCOM Association CJSC
Polymer coating performing of the area of over 48,000 m2.
The first phase of construction of the Pobeda LSR plant for the production of facing bricks and ceramic products
at Leningrad region, Kirov district, Nikolskoye highway, section 55
Customer: «Pobeda LSR».
Enabling works. The unit of the solid concrete constructions of the plate area of more than 50,000 m2. Construction of monolithic pits, cable channels, foundations for equipment. Installation of the wells, the laying of pipelines.
Customer: HYUNDAI AMCO RUS
Construction of HYUNDAI plant
St. Petersburg, Sestroretsk, Levashovsky highway 20
Reinforced concrete slab container yards (more than 3,600 m3 of concrete). Installation of storm water drain and fire-fighting water conduit.
Pits, foundations for equipment (assembly shop).
The base of the floor slab (assembly shop and warehouse).
Industrial concrete floors with strengthened top layer area of over 50,000 m2.
More than 10,000 m2 of polymer coatings placed.

Poultry Northern Plant JSC
Poultry houses for fattening of broiler chickens
Leningrad region, Kirovsky district, Molodtsova village.
Enabling works, construction of retaining walls, access panels.
Submitted reinforced concrete slab floor with a reinforced upper layer on the area of 80,000 m2